top of page

CHIPPEWA 7-8 MIDDLE SCHOOL

Project Details | Expected Occupancy 2026

Kinawa and Chippewa Middle Schools will be replaced with two connected buildings on the Chippewa site. Fifth through sixth grade and seventh through eighth grade will remain separate with dedicated parent and bus drop-off loops yet will share some amenities such as a state-of-the-art auditorium. Additional features will include outdoor learning spaces and natural pathways throughout the site.

 

A portion of the current Chippewa Middle School will be renovated and used as part of the new shared space between the new middle schools. Significant additions will be made to construct the two schools.

BP3.png

Design Schedule

Project Designs

bottom of page